Annex 3.1 to OMCL GL Evaluation and Reporting of Results General Introduction – Verification of Initial Out-Of-Specification Results - PAPHOMCL21)03R2

The objective of this Annex is to describe the steps to follow for the management of out-ofspecification (OOS) testing results. The failure investigation may also be triggered if validation criteria defined by the method or laboratory are not met, including out-of-trend (OOT) results. To simplify the text, only OOS is used.